The Gym Group

Multi-gym installations, UK

20 years of gym rollouts delivered on time, and on budget

Project Overview

The Gym Group opened its first site in Hounslow in 2008, with Guildford and Vauxhall following soon after – the start of what became the UK’s low-cost gym model. Matrix Consult came on board in those early days, brought in for project management and cost consultancy as the business worked out what a nationwide roll-out would actually take.

Nearly two decades on, that’s exactly what it’s become: over 250 sites UK wide, run on the same twelve-week build programme regardless of what the building started out as. There isn’t much margin for error at that scale, which is why getting the planning right from day one still matters as much now as it did with site number one.

^

Contract value: £600k – £1m

^

Project Duration: Circa 4 Months per site

^

Location: UK-wide

^

Scale: Multi-site

^

Services provided: Project Management, Contract Administration, Quantity Surveying

Project Management

A roll-out at this scale only works with consistency. We’ve used the same JCT Standard Form of Contract and the same framework of contractors site to site, the same cost discipline, and the same build programme – so each gym opens on time, whatever the building started life as.

Cost studies and value engineering run throughout, keeping each site within the £600k–£1m range without compromising what The Gym Group needs from the space.

The Outcome

Today, The Gym Group has over 250 sites UK wide. Matrix Consult has delivered more than half of them – industrial units, new builds, conversions, each one run to the same twelve-week build programme.

Matrix Consult knows the brand, knows what “good” looks like for them, and has grown alongside the business as it’s expanded – nearly two decades on from those first gyms. There’s more in the pipeline, and the same standards apply to whatever comes next.

Client Review

Matrix Consult has been a fundamental part of The Gym Group's success, their involvement in our sites as Project Managers and Cost Consultants has been vital to ensure projects are delivered on time and budget."

John Treharne

Chair of the Board, The Gym Group

Other Projects in this Sector

Village Hotels

Gym and leisure refurbishment, Watford

Health and Fitness, Leisure

  • Location: Watford, UK
  • Scale: Single site
  • Services provided: Project Management, Employer's Agent, Contract Administration

The Padel Club

Supporting the padel brand's fast-moving national rollout

Health and Fitness, Leisure

  • Location: UK-wide
  • Scale: Multi-site
  • Services provided: Project Management, Contract Administration, Quantity Surveying

Hurlands

Pickleball and Padel Club, Farnham

Health and Fitness, Leisure

  • Project Duration: 4 months
  • Location: Farnham, UK
  • Scale: Single site
  • Services provided: Project Management, Cost Consultancy

Oxygen Active Play

UK-wide trampoline park roll-out

Health and Fitness, Leisure

  • Contract value: £500k–£1.1m
  • Project Duration: 3 to 4 months per site
  • Location: UK-wide
  • Scale: Multi-site
  • Services provided: Project Management, Cost Consultancy

The Climbing Hangar

Tailor made approach to opening new sites

Health and Fitness, Leisure

  • Project Duration: Circa 3 months per site
  • Location: UK-wide
  • Scale: Multi-site
  • Services provided: Project Management, Employer's Agent, Contract Administration

Matrix Consult.

Office One, 1 Coldbath Square,
Farringdon, London EC1R 5HL

mail@matrix-consult.co.uk

Contact Us

If you're working on a construction project in the leisure, health and fitness, or commercial sectors, we'd love to hear from you. Tell us what you're working on, and we'll have a straightforward conversation about how we can help.

This field is required.
This field is required.
This field is required.
Matrix Logo NW light

Matrix Consult Limited

mail@matrix-consult.co.uk

Office One, 1 Coldbath Square,
Farringdon, London EC1R 5HL
Company number 05211741

© Matrix Consult 2026